Capital repair of railway line 116 Livezeni – Simeria Bănița – Merișor brad I interval km 67+620-62+150
Client:Regionala CFR TimisoaraDuration: 24 months Track reconstruction: 5,497 km (540 tons of rail; 4,652 concrete sleepers; 4,688 wooden sleepers; 85 special bridge sleepers: 10,900 tons of crushed stone; 14 Glued insulated rail joints) Signalization Works
Catenary and Preotection Work