Rehabilitation of the public railroad infrastructure in the port of Constanța
Client: Regionala CFR ConstanțaDurată: since June 2022 From June 2022 to the present day, extensive maintenance work has been carried out on the rail infrastructure in the port of Constanța with the aim of increasing efficiency. Track maintenance: renewal of over 70 km of track with completely new materials.
Switch installation: Installation of over 150 new type 90 switches with radii of 300 and 190 m.
Sleeper replacement: 28 turnouts received new wooden sleepers.
Track maintenance
Switch installation
Sleeper replacement