Construction of catenary for the rehabilitation of the Border – Curtici – Simeria railroad line
Client: Siemens Mobility S.R.L.Duration: 2017 – 2024 The renovation of the Border – Curtici – Simeria railroad line is part of Pan-European Transport Corridor IV and enables train speeds of up to 160 km/h. This project includes important technical measures to improve the infrastructure. Electrical protection: Carrying out work to electrically protect the installations along and next to the track.
Overhead lines: Installation of 45.65 km of overhead lines on the main line and 6.67 km on the branch lines.
Poles and anchors: 900 masts and anchors were installed in 2022 alone.
Overhead lines
Poles and anchors
Electrical protection