Works for eliminating speed restrictions and restoration of the technical parameters of track superstructure on the Galati SRCF line
Client: Regionala CFR GalaţiDuration: January 2023 – November 2024 “Quick Wins” type project Lot 1 Staţia Cosmeşti fir I+II km CF 229+390 / 229+545 Lot 2 Staţia Cosmeşti fir I+II km CF 230+440 / 230+606 Lot 3 Racordare Staţia Cosmeşti – Staţia Tecuci Nord linie simplă km CF 235+520 / 239+568
Lot 4 Staţia Cosmeşti – Staţia Tecuci Sud fir II km CF 235+520 / 237+600
Lot 5 Staţia Tecuci – Staţia Tecuci Nord linie simplă km CF 238+250 / 241+000
Lot 6 Staţia Adjud – Staţia Borzeşti Bacău linie simplă km CF 0+000 / 2+545
Complete superstructure reconstruction with entirely new materials, including rail welding and joint-free track construction: 10,710 km of track (1,407 tons of rail; 92 JILs; 18,950 concrete sleepers; 161,000 tons of ballast)
Complete replacement of track switches with new switches mounted on concrete sleepers, including welding of joints and embedding in the track without joints: 29 equivalent switches
Reconstruction of level crossings: 3 pieces – 52.2 m